首页|某高速公路互通立交工程防治区水土保持措施

某高速公路互通立交工程防治区水土保持措施

扫码查看
某高速公路水土保持项目工程主要由路基工程、桥梁工程、隧道工程、互通立交工程、附属设施等5部分组成。文章主要对互通立交工程防治区工程措施、植物措施、临时措施进行详细分析,互通立交工程区具有水保功能并纳入水保方案的主要措施:表土剥离及回覆、道路两侧修筑排水边沟、急流槽、截水沟、路基边坡防护、护坡道绿化、空地景观绿化等。
Soil and Water Conservation Measures in the Prevention and Control Area of a Certain Expressway Interchange Projects
A highway soil and water conservation project is mainly composed of five parts:subgrade engineering,bridge engineering,tunnel engineering,interchange engineering,and ancillary facilities.This paper mainly analyzes the engineering measures,plant measures and temporary measures in the prevention and control area of the interchange project.The interchange engineering areas have the function of water protection and the main measures in the water protection plan are topsoil stripping and resurpassing,construction of drainage ditches,rapid flow grooves,interception ditches on both sides of the road,roadbed slope protection,ramp protection greening,vacant landscaping and so on.

soil and water conservationsoil erosionmeasureinterchanges

尹洪雨

展开 >

河南省白沙水库运行中心,河南 禹州 461670

水土保持 水土流失 措施 互通立交

2024

河南水利与南水北调
河南省水利厅

河南水利与南水北调

影响因子:0.382
ISSN:1673-8853
年,卷(期):2024.53(3)
  • 1