某项目调蓄池工程设计要点

扫码查看
某项目调蓄池工程是河道综合治理过程采用调蓄池截流调蓄,项目工程主要是采取高标准的初(小)雨截流调蓄措施,减少雨季面源污染入河入湾,提高河流水质保障率。文章根据调蓄池位置,结合调蓄池旱季及雨季运行工况调,详细分析了调蓄池1#、4#、5#工艺设计方案。调蓄池工程的实施提升了河道水环境,为河流生态长廊景观公园的建设创造良好水环境条件。
Key Points in the Design of a Certain Project's Storage Tank Engineering
The regulation and storage tank project of a certain project is a comprehensive river management process that uses regulation and storage tanks for interception and storage.The project mainly adopts high-standard early(small)rainfall interception and storage measures to reduce non-point source pollution into the river and bay in the rainy season,and improve the water quality guarantee rate of the river.According to the location of the storage tank,combined with the operating conditions during the dry and rainy seasons,the process design scheme of 1#,4#and 5#of the storage tank was analyzed in detail.The implementation of the reservoir project has improved the water environment of the river and created good water environment conditions for the construction of the river ecological corridor landscape park.

storage tankdesign schemeswater environment

苏林海

展开 >

深圳市南山区水务局,广东 深圳 518502

调蓄池 设计方案 水环境

2024

河南水利与南水北调
河南省水利厅

河南水利与南水北调

影响因子:0.382
ISSN:1673-8853
年,卷(期):2024.53(4)
  • 2