首页|水库工程标准化管理评价要点分析及创建措施

水库工程标准化管理评价要点分析及创建措施

扫码查看
为强化工程安全管理,落实管理责任,提升管理能力,建立健全运行管理长效机制,全面推进水利工程标准化管理。白沙水库运行中心经过多年筹备,对照水利部、河南省水利厅关于大中型水库工程标准化管理的具体要求,进一步补短板、强弱项、找差距、促提升,于2023年通过省一级标准化管理工程评价,并做好水库工程标准化管理水利部评价准备。
Analysis of Key Points and Creation Measures of Standardized Management Evaluation of Reservoir Engineering
In order to strengthen engineering safety management,implement management responsibilities,enhance management capabilities and establish and improve long-term operational and management mechanisms,standardized management of water conservancy projects is comprehensively promoted.After years of preparation,according to the specific requirements of the Ministry of Water Resources and the Provincial Department of Water Resources on the standardized management of large and medium-sized reservoir projects,Baisha Reservoir Operation Center has further supplemented its shortcomings,strengths and weaknesses,identified gaps,and promoted improvement.In 2023,it passed the provincial level standardized management project evaluation.It has prepared for the evaluation of standardized management of reservoir engineering by the Ministry of Water Resources.

Baisha Reservoirstandardized managementprovincial level evaluation

罗艳丽

展开 >

河南省白沙水库运行中心,河南 许昌 452570

白沙水库 标准化管理 省一级评价

2024

河南水利与南水北调
河南省水利厅

河南水利与南水北调

影响因子:0.382
ISSN:1673-8853
年,卷(期):2024.53(4)
  • 2