Safety Review and Reinforcement Plan of Wujiazi Reservoir Dam
In order to ensure the safe operation of Wujiazi Reservoir,prevent downstream people and property from being threatened,and continue to exert the aquaculture benefits of the reservoir,the safety situation of the reservoir project was reviewed and analyzed by collecting the relevant parameters of the reservoir.The results showed that the top elevation of the lowest point on the northwest corner of the reservoir bank,which was 101.77m,was lower than the check flood level,and the elevation of the remaining part of the reservoir bank was lower than the check flood level plus the safety super high requirement.The reservoir needs to be treated with hazard removal and reinforcement engineering,It is more feasible to adopt Plan Four for reinforcement treatment based on the actual situation of the reservoir.
reservoirsafety reviewreinforcement of risk eliminationplan