In order to analyze the social risk of the project construction of the flood storage and detention area of the Wei River,the research was carried out on the basis of previous studies.10 evaluation indexes were selected.The weight of each index was obtained by the method of combination weighting,in which the policy scheme risk,the project quality risk and the influence of shutdown were the influential factors with greater weight.Through the questionnaire survey of stakeholders,the social risk level of the project construction is low risk.It is suggested that in the process of project implementation,the management and control of policy and scheme risk,project quality risk and the effect of shutdown should be strengthened,so as to further reduce the risk of project construction.