首页|某建设项目水土保持措施分析

某建设项目水土保持措施分析

扫码查看
根据建设项目现场情况、项目区微度水力侵蚀特点、工程特点以及实地调查(勘测)结果,在确定的水土流失防治责任范围内依据主体工程布局、施工扰动特点、工程建设时序、地貌特征、自然属性、水土流失影响等,确定水土流失防治措施。文章主要对项目区、堆场区、堤防工程以及临时堆土场区布设的工程措施、植物措施、临时措施进行详细分析说明,合理确定水土保持措施的总体布局,以形成完整、科学的水土保持防治体系。
Analysis of Soil and Water Conservation Measures of a Construction Project
According to the site situation of a construction project,the characteristics of microdegree hydraulic erosion in the project area,engineering characteristics and the results of field investigation(survey),the soil and water conservation prevention and control measures are determined according to the layout of the main project,the characteristics of construction disturbances,the timing of engineering construction,the geomorphological characteristics,the natural attributes,and the impact of soil erosion within the responsibility area for soil erosion prevention and control.This paper mainly analyzes and explains in detail the engineering measures,plant measures and temporary measures laid out in the wharf area,storage yard area,embankment project and temporary dump area,and reasonably determines the overall layout of soil and water conservation measures,so as to form a complete and scientific soil and water conservation prevention and control system.

soil and water conservationsoil erosionmeasurelayout

陈娟

展开 >

郑州市生态供水保障中心,河南 郑州 450000

水土保持 水土流失 措施 布设

2024

河南水利与南水北调
河南省水利厅

河南水利与南水北调

影响因子:0.382
ISSN:1673-8853
年,卷(期):2024.53(5)
  • 2