Construction Points of Prefabricated Hoisting of Yanggonggou Aqueduct
Taking Yanggonggou aqueduct as an example,this paper studies the key points of its integral prefabricated lifting construction.Through the detailed planning of the design characteristics and hoisting process of aqueduct,a scientific and reasonable construction scheme is formulated.During the preparation phase,the lifting area was cleared to ensure that the foundation and crane equipment met the requirements.In the process of lifting,a large tonnage crane is used to ensure the safety and accuracy of lifting through real-time monitoring.In terms of safety measures,attention is paid to safety ideological education,the introduction of safety technology guarantees,and the implementation of comprehensive safety measures to minimize potential risks.The successful construction provides valuable experience for future water conservancy projects and feasible operation mode for similar projects.This research has guiding significance in the field of aqueduct construction,and plays an active role in promoting the efficiency and safety of hydraulic engineering construction.
Yanggonggou aqueducthoisting constructionkey points of research