The Construction Scheme for Pressure Pipe Jacking Through Structures
Water Diversion Tunnel is widely utilized due to its ability to significantly shorten the distance of water diversion and minimize the impact on ground ecology.The pipe jacking construction of a water transmission pipeline project necessitates traversing through complex structural and environment conditions,thereby posing inherent risks to the construction process.The grouting method is employed to enhance the foundation and improve the strength and stability of the soil,aiming to minimize disruption to the ongoing project while ensuring its safety.The method of grouting reinforcement is employed to enhance the foundation and improve the strength and stability of the soil,aiming to minimize disruption to the existing project while ensuring its safety.During the construction of pipe jacking,strict adherence to the requirements of construction technology is essential.and may be encountered in drift stone,the split method for treatment and other technical measures.The practical results demonstrate the effectiveness of the adopted construction measures in meeting the requirements of the project,providing valuable insights for similar engineering endeavors.