首页|出山店水库平昌关圩区浸没处理设计

出山店水库平昌关圩区浸没处理设计

扫码查看
针对出山店水库平昌关圩区水库蓄水后出现的浸没现象,文章通过对浸没场区地质调查、工程地质条件、地下水临界埋深和现状问题等方面进行了综合分析,提出针对圩区内受浸没影响的房屋和土地的解决方案,包括居民后靠安置和土地抬高。工程实践结果表明,这些措施成功遏制了浸没现象,不仅提升了土地使用效率,也改善了居民的生活品质。
Design of Immersion Treatment for the Pingchangguan Polder Area in Chushandian Reservoir
In view of the immersion phenomenon observed in the Pingchangguan polder area of Chushandian Reservoir after impoundment,this paper aims to provide a more specialized analysis.Based on a comprehensive analysis of the geological survey,engineering geological conditions,critical groundwater depth and current problems in the immersion area,a specific solution is proposed for addressing the impact of immersion on houses and land in the polder area.This includes the resettlement of residents and land elevation.The results of engineering practice demonstrate that these measures have effectively mitigated the phenomenon of immersion,thereby enhancing both land use efficiency and residents'quality of life.

Chushandian Reservoirimmersion phenomenontreatment measuresresidents resettlementland elevation

石永生

展开 >

信阳市河湖事务中心,河南 信阳 464000

出山店水库 浸没现象 处理措施 居民安置 土地抬高

2024

河南水利与南水北调
河南省水利厅

河南水利与南水北调

影响因子:0.382
ISSN:1673-8853
年,卷(期):2024.53(5)
  • 2