The Comparative of Diversion Scheme for the Head Dam of Tuanhui Canal
The comparison of the construction diversion scheme in irrigation area is an important part of the construction technology involved in canal head dam projects,and it holds significant engineering significance for accelerating the construction process.Therefore,the analysis and discussion of the pilot case for the water source project of in the irrigation area of Tuanhui Canal,Dengzhou City is conducted.The results indicate that on the basis of a comprehensive understanding of the turbulence canal dam project overview,the recommended diversion scheme for barrage and diversion channel construction primarily focuses on irrigation dam construction.After final optimization,it is suggested to adopt a canal dam construction diversion scheme(including steel plate pile protection and lead wire cage foot protection measures)which is both economically viable and capable of meeting flood season requirements.This research result not only contributes to the accumulation of knowledge for future diversion ditch support,but also serves as a reference for similar engineering construction practices.
water source project of Tuanhui Canal irrigation areacanal head damconstruction diversion schemecomparison and selection