The Mainstream Standard Section Design and Typical Section Pile Foundation Cost Analysis of Huangpu River Dike
The current defense capability of the Huangpu River dike mainstream is insufficient due to the impact of rising sea levels,changes in river basin water conditions,and settlement of dikes.Therefore,the risk of overflow at the top of the embankment has increased.This plan presents the standard section design of the dike flood prevention wall and conducts a cost analysis on five different types of pile foundations,thereby offering valuable reference experience for similar dike projects.
Huangpu Riverdike mainstreamstandard sectionpile foundation cost