首页|板桥水库水下防渗面板新老混凝土结合状态试验分析

板桥水库水下防渗面板新老混凝土结合状态试验分析

扫码查看
板桥水库溢流坝采用水下不分散混凝土进行了防渗面板浇筑,为保证新老混凝土结合质量符合设计标准,对影响新老混凝土结合的因素进行了试验,新老混凝土结合面埋设了观测仪器,对观测数据进行了分析。
Test Analysis of Combined State of New and Old Concrete in Underwater Seepage Control Slab of Banqiao Reservoir
The anti-seepage panel of overflow dam of Banqiao Reservoir is poured with underwater non-dispersed concrete.In order to ensure that the quality of the combination of new and old concrete meets the design standards,the factors affecting the combination of new and old concrete are tested,and the observation instrument is buried in the joint surface of the new and old concrete,and the observation data are analyzed.

new and old concrete bonding surfaceinfluencing factorsinstrument embeddingdata analysis

杨伟

展开 >

驻马店市板桥水库运行中心,河南 驻马店 463700

新老混凝土结合面 影响因素 仪器埋设 数据分析

2024

河南水利与南水北调
河南省水利厅

河南水利与南水北调

影响因子:0.382
ISSN:1673-8853
年,卷(期):2024.53(5)
  • 2