The Analysis of the Construction Diversion Scheme for the Balustrade Spillway
The appropriate diversion scheme for construction is selected by conducting a comparative analysis of several schemes,taking into consideration the actual situation and engineering experience of the railing floodway channel.The combined diversion scheme(lower Tuman River diversion and channel diversion scheme)is selected as the construction diversion scheme based on the comprehensive comparison and selection of the project area,investment,construction safety,construction difficulty and construction period.The findings can serve as a valuable point of reference for similar projects.