The Analysis and Evaluation of Soil and Water Conservation Measures in the Primary Design of the Central Guizhou Water Conservancy Project
The analysis and evaluation of water and soil conservation measures in the primary design of water conservancy project hold significant engineering importance for the scientific implementation of such measures,as well as for further improvement of the water and soil conservation scheme of reservoir hub project.Therefore,the typical practice cases of water and soil conservation measures are incorporated into the primary design phase of the Central Guizhou Water Conservancy Project in Guizhou Province.The findings indicate that,on the basis of a comprehensive understanding of the project overview,first of all,the analysis and evaluation are focused on water and soil conservation measures in various areas including the dam hub area,permanent office and living area,construction production and living area,road engineering area,material yard area,waste yard area,slag disposal area,resettlement area and special facilities reconstruction area.The second aspect involves the analysis and evaluation of soil and water conservation measures in six key areas within the main canal area of Guiyang water supply projec,including the canal line area,construction office and living area,road engineering area,material yard area and waste dump area.Finally,the analysis and evaluation of water and soil conservation measures have been successfully completed in the five main areas of the irrigation zone,construction site,production and residential area,road engineering zone,material yard area and slag disposal area.It can serve as a valuable reference for the analysis and evaluation of water and soil conservation measures similar to the primary design of water conservancy projects.
Central Guizhou water conservancy projectprimary project designsoil and water conservation measuresanalysis and evaluation