The Analysis of the Construction Plan for the Qingyuan Wujiehe Flood Sluice
In order to improve the safety and flood control capacity of the Qingyuan Wujiehe Flood Sluice,the original flood sluice has been demolished and rebuilt.Considering the drainage capacity of the sluice gate,the construction scale and relevant characteristic water level are determined based on the surrounding planning.After calculation,the calculated anti-seepage length is 22.8 m,which meets the requirement for the anti-seepage length of sluice.Additionally,the design horizontal anti-seepage length of Wujiehe Sluice is 39 m.Through the stability review analysis of sluice chamber,the stability of sluice meets the requirements.