卡河水库因左岸深部岩溶在多年蓄水后被渗透击穿破坏,导致水库无法正常蓄水,对水库进行渗漏处理是必要的,也是急迫的.为此,展开卡河水库工程渗漏处理帷幕灌浆方案比选研究.结果表明,熟悉工程概况,首先围绕防渗帷幕范围、防渗原则及防渗走线选择等方面确定防渗帷幕范围;随之拟定方案一:平硐灌浆方案和方案二:地表灌浆方案实施比较,并确定优选地表灌浆方案用于卡河水库工程渗漏处理帷幕灌浆方案设计.也可为类似工程实践提供借鉴参考.
Due to the long-term water storage,the deep karst on the left bank of Kahe Reservoir has suffered from penetrated and breakdown,resulting in abnormal storage.Therefore,it is imperative to address the leakage issue of the reservoir.The comparative selection of grouting scheme for the curtain of leakage treatment in the Kahe Reservoir Project is conducted.After gaining a comprehensive understanding of the project's overall situation,the determination of the anti-seepage curtain scope is primarily based on considerations such as the range,principle,and route selection for anti-seepage measures.And then,the tunnel grouting scheme and the surface grouting scheme are then formulated,followed by a comparative analysis of the two schemes.The optimal surface grouting scheme is determined for the design of curtain grouting scheme for leakage treatment of Kahe Reservoir Project.It can also provide a reference for similar engineering practice.

reservoir engineeringleakage treatmentcurtain grouting schemecomparison and selection

袁杰

展开 >

贵州省六盘水市盘州市鸡场坪镇农村工作服务中心,贵州 盘州市 553525

水库工程 渗漏处理 帷幕灌浆方案 比选

2024

河南水利与南水北调
河南省水利厅

河南水利与南水北调

影响因子:0.382
ISSN:1673-8853
年,卷(期):2024.53(6)