Construction Techonology of a River Regulation Project
The construction content of a river treatment project includes embankment engineering,river dredging engineering,bank protection engineering,culvert sluice gate,G312 control gate,impact treatment of water pumping station along the river,road management along the river,ecological restoration,etc.The project carries out river dredging and reinforcement of embankments according to the 20-year flood control standard.The reasonable service life of embankments,structures passing through embankments,and control gates with a building level of 4 is 30 years.According to the specific situation of the project,the construction of the embankment reinforcement project,the dredging project and the G312 barrage gate is described in detail.