Key Points of Spillway Design for the Flood Control Emergency Project of Anshan Reservoir
The spillway is the most important flood control facility for reservoir flood control emergency project,which can ensure the safe operation of reservoir.Therefore,the paper analyzes and studies the key points of spillway design for the flood control and emergency project of Anshan Reservoir in Neixiang County as a practical case.On the basis of the comprehensive understanding of the project,the main problems of the spillway project are analyzed.Focusing on the planning,comparison,and optimization of spillway engineering schemes,scheme comparison is carried out to select scheme two;The broad-crested weir scheme is the spillway design scheme.Then the spillway project design was implemented in terms of spillway project layout,hydraulic calculation and structural design.It can provide reference for the design practice of spillway in similar flood control and emergency projects.
Anshan Reservoirflood control and emergency projectreservoir spillwaydesign