首页|庵山水库防汛应急工程溢洪道设计要点

庵山水库防汛应急工程溢洪道设计要点

扫码查看
溢洪道是水库防汛应急工程最重要的防洪设施,能够保证水库安全运行。为此,文章以内乡县庵山水库防汛应急工程溢洪道设计要点为实践案例展开分析研究。在全面了解工程概况的基础上,分析溢洪道工程现状主要问题;着重围绕溢洪道工程方案拟定、比较及优选等方面进行方案比选,从而优选方案二:宽顶堰方案为溢洪道工程设计方案;随后就溢洪道工程布置、水力计算和结构设计等方面实施溢洪道工程设计。可为类似水库防汛应急工程溢洪道设计实践提供借鉴参考。
Key Points of Spillway Design for the Flood Control Emergency Project of Anshan Reservoir
The spillway is the most important flood control facility for reservoir flood control emergency project,which can ensure the safe operation of reservoir.Therefore,the paper analyzes and studies the key points of spillway design for the flood control and emergency project of Anshan Reservoir in Neixiang County as a practical case.On the basis of the comprehensive understanding of the project,the main problems of the spillway project are analyzed.Focusing on the planning,comparison,and optimization of spillway engineering schemes,scheme comparison is carried out to select scheme two;The broad-crested weir scheme is the spillway design scheme.Then the spillway project design was implemented in terms of spillway project layout,hydraulic calculation and structural design.It can provide reference for the design practice of spillway in similar flood control and emergency projects.

Anshan Reservoirflood control and emergency projectreservoir spillwaydesign

赵姗姗

展开 >

河南灵捷水利勘测设计研究有限公司,河南 南阳 473000

庵山水库 防汛应急工程 水库溢洪道 设计

2024

河南水利与南水北调
河南省水利厅

河南水利与南水北调

影响因子:0.382
ISSN:1673-8853
年,卷(期):2024.53(6)
  • 1