Dike Control Measures of Yuangong River Upstream Regulation Project
In order to promote the ecological environment construction of the upper reaches of the Yuangong River and improve the level of flood control safety,the river embankment was reinforced with 6.0 m road surface width on the top of the embankment and 1.0 m road shoulder on both sides.The water-facing slope of the embankment was 1∶2.5 and the backwater slope was 1∶2.5.By checking and calculating the stability of levee slope and seepage,the safety of levee structure meets the relevant requirements.The scheme of governance project can provide reference for similar projects.