Design of Soil and Water Conservation Measures for a Mining Project
The design of water and soil conservation measures for the construction of a mining project is adapted to local conditions,with hazard prevention measures implemented.A combination of engineering,vegetation,and temporary prevention and control measures is implemented,and a scientific,reasonable and comprehensive prevention and control system is set up to provide technical support for development and construction units to do a good job in water and soil conservation.According to the basic situation of soil erosion in the project area,this paper elaborates the engineering measures,plant measures and temporary measures taken in the 1~5#mining area of the industrial site.In particular,through the accurate calculation of the overflow capacity of the drainage ditch,the specific quantity values such as the section type,section size and lining thickness of the drainage ditch can be determined,and the soil erosion caused by it can be effectively controlled,and the indicators of prevention and control measures in each project area can reach the predetermined goals.
soil and water conservationengineering measuresplant measures