Analysis of Flood Control Impact on a Newly Constructed Waste Water Treatment Plant
According to the specific situation and engineering design plan of a newly built waste water treatment plant,this paper specifically discusses and analyzes from the following aspects:① the impact on the flood carrying capacity of the river channel.② The impact on the overall and local flow patterns of the river channel.③ The impact on river stability.④ The impact on the stability and safety of embankments.⑤ The impact on the embankments and bank slopes on both sides.⑥ The impact on the fourth rubber dam and Xuefeng Bridge upstream.⑦The impact on the operation and management of water conservancy projects and flood prevention and emergency response.It provides technical support for flood control impact assessment for the smooth implementation of the project.
flood control impact analysisnewly built waste water treatment plantpump station