Construction Measures for Water Damage Restoration Project of Dashahe River in Jiaozuo City
In order to improve the construction level of the water damage restoration project of the Dasha River in Jiaozuo City,this paper mainly studies the hydrological characteristics,construction difficulties,and construction measures of the river.Based on the construction difficulties of the Dasha River channel water damage restoration project in Jiaozuo City:biological growth,geological complexity,and residents'cooperation.This paper focuses on analyzing the construction measures:construction preparation,construction diversion,and main project construction.Through river channel regulation,dredging,embankment filling,bank slope protection,flood control road restoration,production bridge reconstruction,ecological habitat restoration and other engineering construction,the comprehensive restoration of water damage in Dasha River has been completed,further enhancing the flood control capacity of Dasha River.
Dasha River in Jiaozuo Cityriver water damage restoration projectconstruction difficultiesconstruction measures