The Construction Techniques of the Primary Infrastructure of Hazard Removal and Reinforcement in a Reservoir Dam
A reservoir is a small(2)type water conservancy project.The temporary structure is classified as grade 5.The dam is divided into earth dam section and concrete dam section.The construction scheme of the main dam project from the aspects of construction diversion,foundation treatment,dam concrete pouring,concrete maintenance and metal structure installation are analyzed and expounded in this paper.It is hoped that this study can offer valuable insights for the similar water conservancy projects.