首页|某水库大坝除险加固主体工程施工技术

某水库大坝除险加固主体工程施工技术

扫码查看
某水库属小(2)型水利工程,临时建筑物为5级,大坝分为土坝段和混凝土坝段。文章从施工导流、基础处理工程、大坝混凝土浇筑、混凝土养护、金属结构安装等方面分析阐述了大坝主体工程施工方案,希望能够为类似水利工程的建设提供借鉴和参考。
The Construction Techniques of the Primary Infrastructure of Hazard Removal and Reinforcement in a Reservoir Dam
A reservoir is a small(2)type water conservancy project.The temporary structure is classified as grade 5.The dam is divided into earth dam section and concrete dam section.The construction scheme of the main dam project from the aspects of construction diversion,foundation treatment,dam concrete pouring,concrete maintenance and metal structure installation are analyzed and expounded in this paper.It is hoped that this study can offer valuable insights for the similar water conservancy projects.

dangerous reservoirenergy-saving measuresenergy consumption analysis

赵辉

展开 >

驻马店市板桥水库管理局,河南 驻马店 463715

病险水库 节能措施 能耗分析

2024

河南水利与南水北调
河南省水利厅

河南水利与南水北调

影响因子:0.382
ISSN:1673-8853
年,卷(期):2024.53(7)