依据水库工程溢洪道开挖所揭露的工程地质条件,结合溢洪道边坡现有变形及支护状况,做好边坡支护设计变更方案分析对水库工程建设具有十分重要的工程意义.为此,联系板丛水库工程溢洪道右侧边坡支护设计方案分析典型案例展开分析研究.结果表明,在全面熟悉工程概况的基础上,首先围绕与此设计变更相关的意见和溢洪道右侧边坡支护方式完成溢洪道右侧边坡支护设计变更方案分析;同时进行溢洪道控制段与泄槽段计算复核,为边坡加强支护施工提供设计依据.也可为类似工程实践提供借鉴参考.
Considering the engineering geological conditions revealed during spillway excavation and the existing deformation and support condition of the spillway slope,the analysis of slope support modification for reservoir construction holds significant engineering importance.Therefore,the typical case of the right side slope support design scheme of the spillway of Bancong Reservoir Project is analyzed and studied.Based on an overall project assessment,the analysis of the control section of the spillway and the spillway section is conducted based on the opinions related to the design change and the support method of the right side slope of the spillway.At the same time,the calculation and review of spillway control section and drainage channel section are carried out to provide design basis for the slope strengthening support construction.It can also provide a reference for similar engineering practice.

Bancong Reservoir Projectright side slope of spillwaysupport designscheme modificationanalysis

刘文炜

展开 >

长顺县水务局,贵州 长顺 550700

板丛水库工程 溢洪道右侧边坡 支护设计 变更方案 分析

2024

河南水利与南水北调
河南省水利厅

河南水利与南水北调

影响因子:0.382
ISSN:1673-8853
年,卷(期):2024.53(7)