Study on Construction Cost Prediction of Hydraulic Tunnel Based on Optimized Support Vector Algorithm
Hydraulic tunnel engineering is an important part of water diversion project.In order to improve the level of construction cost prediction,the cost prediction index system of hydraulic tunnel engineering is established by reference to the current norms.Based on the bat algorithm,the support vector algorithm model is optimized and the cost prediction model is constructed.The study results show that the cost prediction model is scientific and applicable,that is of great significance for improving the efficiency of construction cost control of hydraulic tunnel engineering.
support vector algorithmhydraulic tunnel engineeringconstruction cost prediction