河南水利与南水北调2024,Vol.53Issue(10) :35-36.

穿越顶管专项实施技术在引江济淮工程中的应用

Application of Pipe Jacking Technology in the Project of Diversion of Yangtze River Water to Huaihe River

刘强 蒋亚涛 侯君
河南水利与南水北调2024,Vol.53Issue(10) :35-36.

穿越顶管专项实施技术在引江济淮工程中的应用

Application of Pipe Jacking Technology in the Project of Diversion of Yangtze River Water to Huaihe River

刘强 1蒋亚涛 2侯君2
扫码查看

作者信息

  • 1. 河南省淮河流域水利事务中心,河南 漯河 462000
  • 2. 河南省豫东水利保障中心,河南 开封 475002
  • 折叠

摘要

穿越顶管工程施工是一项复杂且多元化的工程技术,涉及到多个领域的专业知识和技术手段.文章将重点探讨以河道为主要穿越对象的顶管专项施工实施过程,并以中继间技术为具体案例,详细阐述顶管施工技术的各个环节和关键步骤.通过对这一技术的深入分析和研究,旨在为未来类似穿越工程的实施提供有价值的借鉴和指导.

Abstract

Pipe jacking engineering construction is a complex and diversified engineering technology,involving the professional knowledge and technical means of many fields.This paper will focus on the implementation process of crossing river pipe jacking,and take the relay technology as a specific case to elaborate each link and key steps of pipe jacking construction technology in detail.Through the in-depth analysis and research of this technology,it aims to provide valuable reference and guidance for the implementation of similar crossing projects in future.

关键词

引江济淮工程/穿越顶管/专项施工方案

Key words

the Project of Diversion of Yangtze River Water to Huaihe River/pipe jacking/special construction scheme

引用本文复制引用

出版年

2024
河南水利与南水北调
河南省水利厅

河南水利与南水北调

影响因子:0.382
ISSN:1673-8853
段落导航相关论文