Rapid Construction Technology of Gate Steel Lining for Water Diversion of Power Generation System
By reserving the gate grooves for steel lining in the 2nd stage hydraulic structures construction,the construction period could be shortened.Based on the specific engineering examples,the key points of the rapid construction technology and quality control for gate steel lining are introduced in detail,that could provide references for the construction of the same type of water conservancy projects.
Kafue Gorge Lower Hydropower Stationsteel lining of gatereserved second stage concreterapid construction