首页|大坝闸墩预应力自锁锚杆加固方案应力分析

大坝闸墩预应力自锁锚杆加固方案应力分析

扫码查看
利用既有水电站作为抽水蓄能电站下库时,水位增高,闸门推力增大,导致既有闸墩承载力不满足要求。针对增设超大预应力扩孔自锁锚杆方案,利用有限元分析方法对该方案进行了分析,结果表明采用该方法能有效降低闸墩拉应力极值。
Stress Analysis of Dam Pier Reinforced by Prestressed Self-locking Anchor
When an existing hydroelectric power station is used as the lower reservoir of a pumped-storage power station,the water level rises and the thrust of the gate increases,resulting in the bearing capacity of the existing gate piers fail to meet the requirements.In this paper,a scheme of installing super-large prestressed self-locking anchor bar is proposed.The finite element analysis method is used to analyze the prestressed self-locking anchoring scheme,and the analysis results show that the method could effectively reduce the maximum tensile stress of the piers.

pre-stressedself-locking anchor barpumped storagegate piershydropower station

廖杰洪、谭星舟

展开 >

武汉巨成结构集团股份有限公司,武汉 430233

武汉大学检测与加固教育部工程研究中心,武汉 430072

预应力 扩孔自锁锚杆 抽水蓄能 闸墩 水电站