摘要

经过 60 余年的发展,中国建成了较为完善的石油天然气长输管道基础设施网络.随着国家石油天然气管网集团有限公司的成立,管道行业建设迎来又一个高峰期.目前,中国长输管道项目结算正在从传统的竣工结算向施工过程结算转变.为此,文章在介绍长输管道项目结算特点的基础上,分析了长输管道项目推行施工过程结算的必要性,指出了施工过程结算存在的问题并提出相关建议和措施.

Abstract

After more than 60 years of development,China has built a relatively complete oil and gas long-distance pipeline infrastructure network.With the establishment of China Petroleum and Natural Gas Pipeline Network Group Co.,LTD.,pipeline industry construction ushered in another peak.At present,the settlement of long-distance pipeline projects in China is changing from the traditional completion settlement to the construction process settlement.Therefore,on the basis of introducing the characteristics of long-distance pipeline project settlement,the paper analyzes the necessity of carrying out construction process settlement,points out the existing problems of construction process settlement,and puts forward relevant suggestions and measures.

关键词

长输管道/项目建设/施工过程结算/石油天然气

Key words

long transportation pipeline/project construction/construction process settlement/oil and gas