With the wide application of integrated construction in the field of deck slab construction,the construction height control in the prefabrication stage of deck slab will directly affect the efficiency and integration rate of construction.SPMT is a self-propelled modular transport vehicle for modular production and assembly,which can be configured into various sizes according to different requirements of loading goods.It has the advantages of flexibility,safety and large load capacity,and has good effects in the high-lift operation of deck pieces.
关键词
SPMT/海洋工程甲板片/高位顶升/一体化建造
Key words
SPMT/marine engineering deck/high lift/integrated construction