化工项目罐区土建技术策划与实施
Planning and Implementation of Civil Engineering Technology in Tank Farm of Chemical Project
胡科 1王亚强 2陈邝 2马一戈 2罗锡2
作者信息
- 1. 中化商务有限公司,北京 100071
- 2. 中昊晨光化工研究院有限公司,四川 自贡 643201;中昊晨光(自贡)氟材料有限公司,四川 自贡 643030
- 折叠
摘要
近年来,中国石油化工行业发展迅速,石化项目建设数量增加.罐区作为石化项目不可缺少的部分,因其技术复杂,在建设过程中易受技术制约.如何降低技术制约同时发挥技术引领作用就成了项目建设必须面对的一个课题.文章以项目建设者在充分熟悉图纸、找出罐区土建工程技术重难点并建立清单后,针对清单中土建工程存在的不同技术难题,通过查阅资料、联系设计和安装单位等寻找最优方案来一一破解,确保了在项目建设过程中的施工质量、安全及工期.
Abstract
In recent years,China's petrochemical industry has developed rapidly,and the number of petrochemical projects has increased.As an indispensable part of petrochemical projects,tank farm is easy to be affected by technical constraints in the construction process because of its complicated technology.How to reduce the technical constraints and play the leading role of technology has become a project construction must face a topic.After the project builders are fully familiar with the drawings,find out the technical difficulties of the tank farm civil engineering and establish a list,according to the different technical problems existing in the list of civil engineering,by consulting the data,contacting the design and installation units to find the best solution to solve one by one,so as to ensure the construction quality,safety and schedule guarantee in the project construction process.
关键词
罐区/土建工程技术/重难点清单/过程管理/化工项目Key words
tank farm/civil engineering technology/list of important and difficult points/process management/chemical project引用本文复制引用