化工项目建设前期风险管理及应对措施

Risk Management and Countermeasures in the Early Stage of Chemical Project Construction

崔娟娟 谢春兵
化工管理2024,Issue(24) :15-17,45.DOI:10.19900/j.cnki.ISSN1008-4800.2024.24.005

化工项目建设前期风险管理及应对措施

Risk Management and Countermeasures in the Early Stage of Chemical Project Construction

崔娟娟 1谢春兵2
扫码查看

作者信息

  • 1. 桓台县行政审批服务局,山东淄博 255000
  • 2. 云翔赛博(山东)数字技术有限公司,山东淄博 255000
  • 折叠

摘要

文章针对化工项目建设前期阶段存在的主要风险和应对策略进行了研究和分析,首先介绍了化工项目前期风险管理的必要性和重要性;其次,以6 000 t/a氟橡胶化工项目为例,探讨化工项目建设前期阶段的主要风险来源,包括决策风险、项目管理组织结构风险、政策风险等;最后,就化工项目建设前期主要风险提出了针对性的应对措施,旨在提升化工项目前期管理水平.

Abstract

The main risks and countermeasures in the early stage of chemical project construction are studied and analyzed.Firstly,the necessity and importance of risk management in the early stages of chemical projects were introduced.Secondly,taking the 6 000 t/a fluororubber chemical project as an example,the main sources of risk in the early stage of chemical project construction are discussed,including decision-making risk,project management organizational structure risk,policy risk,etc.Finally,this paper puts forward specific countermeasures for the main risks in the early stage of chemical project construction,aiming at improving the management level of chemical project in the early stage.

关键词

化工项目/前期风险管理/风险来源

Key words

chemical project/early risk management/risk sources