化工管理2024,Issue(26) :11-13.DOI:10.19900/j.cnki.ISSN1008-4800.2024.26.004

基于5R原则的核电厂备件采购管理分析

Analysis of Procurement Management of Spare Parts for Nuclear Power Plant Based on 5R Principle

王晋君 周大雪
化工管理2024,Issue(26) :11-13.DOI:10.19900/j.cnki.ISSN1008-4800.2024.26.004

基于5R原则的核电厂备件采购管理分析

Analysis of Procurement Management of Spare Parts for Nuclear Power Plant Based on 5R Principle

王晋君 1周大雪1
扫码查看

作者信息

  • 1. 山东核电有限公司,山东烟台 265116
  • 折叠

摘要

文章通过对核电厂备件采购管理的特点及过程进行分析,结合采购的5R控制,通过分析研究,提出了核电厂备件采购过程中的难点和关键控制点.在此基础上,提出了具体的解决方案,为后续核电厂备件采购存在的问题提出了初步的解决方向.

Abstract

This paper analyzes the characteristics and process of nuclear power plant spare parts procurement management,combined with 5R control of procurement,and puts forward the difficulties and key control points in the process of nuclear power plant spare parts procurement.On this basis,the concrete solution is put forward,and the preliminary solution direction is put forward for the problems existing in the procurement of spare parts for the subsequent nuclear power plant.

关键词

5R/核电厂/备件采购

Key words

5R/nuclear power plants/spare parts procurement

引用本文复制引用

出版年

2024
化工管理
中国化工企业管理协会

化工管理

影响因子:0.336
ISSN:1008-4800
段落导航相关论文