In 2022,Liaohe oilfield suffered a rare flood in history,and production in the Shuguang area went to zero for the first time,forcing a large area of oil well facilities to shut down.In order to accelerate the resumption of production and minimize the impact of crude oil production,Liaohe oilfield established an effective production resumption organization system,analyzed the contradiction between flood drainage,road repair and power supply in the early stage of production resumption and the functional positioning of each set of facilities in the production system,established the idea of flood drainage priority and joint station as the center of priority start-up,and all systems were restored in parallel and orderly,and completed 7 flooded substation power supply in 15 days.In five days,the main functions of four joint stations and one first oil transmission station were restored,and more than 3 400 oil Wells were successfully resumed.
关键词
洪灾/油田复产/复产顺序/生产恢复/上产组织
Key words
flooding/oilfield production resumption/reproduction sequence/recovery of production/epigenetic tissue