Discussion on Key Point Control in the Construction Management of Underground Water Sealed Oil Caverns
Currently,underground water sealed cavern storage projects for storing crude oil,refined oil,liquefied petroleum gas and other media have been gradually constructed,and the development of these projects shows a trend of large-scale storage and diversified storage media.As a safe,economical and environmentally friendly storage method,underground water sealed oil caverns are gradually being widely used worldwide.Based on this,this article analyzes the characteristics and construction requirements of underground water sealed oil caverns,summarizes the core control points in the construction management process from optimizing design schemes,controlling construction quality and strengthening safety management.At the same time,it emphasizes scientific and reasonable construction organization design and strict process monitoring,thereby providing useful reference for the construction management of similar projects.
underground water sealed oil cavernsconstruction managementkey point controlconstruction qualitysecurity management