Application of Quality Control Point Theory in Quality Manage-ment of Engineering Design
During the long-term construction process of petrochemical projects in Chi-na,engineering design and engineering construction have respectively formed relatively independent industries.They operate management systems and quality assurance systems with their own characteristics,and continue their respective features and customary practices in quality management.This pa-per conducts management innovation on quality control in engineering de-sign,improves industry practices and habits,and effectively introduces the theories and methods of quality control points in construction quality manage-ment.Through the Fault Tree Analysis(FTA)method and expert analysis method,it iteratively establishes effective design flowcharts and quality con-trol point forms,and strictly implements and inspects them in accordance with quality planning.As a result,the quality of design products has been sig-nificantly improved compared with previous projects,thus carrying out effec-tive theoretical innovation and practical verification for the improvement of design quality management methods.
design qualitydesign flowchartworking procedurequality control points