贵州省某废渣场环境管控方案之封场设计方案初探
Preliminary Study on the Design Scheme of Environmental Control Scheme for a Waste Slag Farm in Guizhou Province
袁松 1段怡彤 1景国瑞 1史阳 2耿欣 2尹然 2王奕文2
作者信息
- 1. 中国城市建设研究院有限公司,北京 100120;中城院(北京)环境科技股份有限公司,北京 100120
- 2. 中城院(北京)环境科技股份有限公司,北京 100120
- 折叠
摘要
以贵州省某废渣场为例,结合《危险废物填埋污染控制标准》(GB 18598-2019)的要求对该废渣场的封场设计方案进行了分析.并从工程建设及实际条件出发,通过终场覆盖系统中防渗层的选择与确定.制定了针对废渣场封场设计方案,可为今后的类似项目封场方案设计提供借鉴与参考.
Abstract
Taking a waste disposal site in Guizhou Province as an example,the sealing design scheme of the waste disposal site was analyzed in accordance with the requirements of the Pollution Control Standard for Hazardous Waste Landfill Sites(GB 18598-2019).Based on the construction and actual conditions,the selection and determination of the anti-seepage layer in the final covering system are discussed.The design scheme for sealing up of waste slag yard is developed,which can provide reference for similar projects in the future.
关键词
废渣场/环境管控/封场/设计方案Key words
waste slag field/environmental control/site closure/design scheme引用本文复制引用