首页|Reasonable Aeration Tap Setting of Burned Oil Sand Particles in Standpipe of a Fluidized Bed

Reasonable Aeration Tap Setting of Burned Oil Sand Particles in Standpipe of a Fluidized Bed

扫码查看
A large scale cold model apparatus of CFB riser reactor was established according to the method of directly fluidized coking oil sand.By changing the position of aeration orifice and amount of aeration air, the solids flux was measured and the location of sensitive aeration orifice above a butterfly valve was fixed (50 mm above the valve).At last, the amount of aeration air for allocation (1~1.5 m3/h) was known and the distance between each pair of consecutive general aeration orifices (about 3 m).And a prediction equation for estimating the relation between the amount of aeration air and the solids flux was established based on experimental data and theoretical analysis, which was Q=6.17 Ws0.8529(D/Do)2(L/Lo).The prediction was in good agreement with the experimental data.By using a multi-point pressure pulsation instrument to measure the pulsation at different altitudes of the standpipe, the pressure pulsation curves at different aeration orifices under different amounts of aeration air were drawn.By Fourier transformation, it was found that there was no obvious dominant frequency when oil sand flowed through the circulation standpipe, and each frequency seemed to make equal contribution to the pressure pulsation.The periodical concentration fluctuation of the particles did not exist in the circulating standpipe, and the pulsation intensity was small.

oil sandcirculating standpipeaeration orificepressure fluctuation

王子健、曹鑫、卢春喜

展开 >

College of Chemical Engineering, China University of Petroleum (Beijing), Beijing 102249, China

National Basic Research Program of China (973)

2012CB215004

2015

过程工程学报
中国科学院过程工程研究所

过程工程学报

CSTPCDCSCD北大核心
影响因子:0.526
ISSN:1009-606X
年,卷(期):2015.15(5)
  • 3