首页|基于水光电力系统时序生产模拟模型的水光优化配比研究

基于水光电力系统时序生产模拟模型的水光优化配比研究

扫码查看
基于考虑系统负荷、新能源发电出力等时序变化特性的时序生产模拟法,建立了水光电力系统时序生产模拟模型;从系统结构性、经济性、灵活性与可靠性方面综合确定最佳水光容量配比,并通过金沙江上游川藏段水光系统验证了模型的合理性.金沙江上游川藏段光伏电站与水电站出力具有较好的年内、日内互补特性;对于2030年水平年,考虑枯期水电留存,913.6万kW水电配套400万kW光伏的方案综合性能更优,其新增非水可再生电量约60亿kW·h.
Study on optimal ratio of water and light based on time-series production simulation model of hydro-optical power system
Based on the time-series production simulation method which takes into account the time-series variation characteristics of system load and power generation output of new energy,the time-series production simulation model of hydro-optical power system is established.The optimal water-light capacity ratio is determined comprehensively from the aspects of system structure,economy,flexibility and reliability,and the rationality of the model is verified by the water-light system of the upper reaches of the Jinsha River in the Sichuan-Tibet section.The outputs of photovoltaic power stations and hydropower stations in the upper reaches of the Jinsha River are complementary within a year and within a day.For the level year of 2030,considering the retention of hydropower during dry period,the comprehensive performance of 9.136 million kW hydropower with 4 million kW photovoltaic is better,and the new non-water renewable electricity is about 6 billion kW·h.

water and light complementary characteristicsoptimal of capacity ratiotime-series production simulation methodupper reaches of Jinsha River

李继清、龙健、刘洋

展开 >

华北电力大学水利与水电工程学院,北京 102206

华北电力大学苏州研究院,江苏苏州 215123

华能澜沧江水电股份有限公司,云南昆明 650214

水光互补特性 优化容量配比 时序生产模拟法 金沙江上游

国家自然科学基金项目国家重点研发计划项目中国长江三峡集团有限公司科研项目

521790142022YFC3002702-40799244

2024

河海大学学报(自然科学版)
河海大学

河海大学学报(自然科学版)

CSTPCD北大核心
影响因子:0.803
ISSN:1000-1980
年,卷(期):2024.52(1)
  • 33