首页|G311线永城境改建工程跨河桥梁防洪评价

G311线永城境改建工程跨河桥梁防洪评价

扫码查看
依据《中华人民共和国防洪法》及相关法律法规的规定,对河道管理内的建设项目应进行防洪评价,编制防洪评价报告.在河道上修建桥梁时,保障河道行洪安全是桥梁建设的基本要求,因此对跨河桥梁进行防洪评价是一项重要工作内容.依据有关法律、法规、规范标准和工程规划批复文件要求,结合河道演变、现有水利工程设施和水利规划及实施安排,合理确定工程建设技术路线,在水文、壅水、冲淤、河势影响等分析计算的基础上,对永城市G311线永城境改建工程跨河桥梁防洪进行综合评价,提出了工程影响防治措施.
Flood Control Evaluation of G311 Reconstruction Project Cross River Bridge in Yongcheng City
According to the Flood Control Law of the People's Republic of China and relevant laws and regulations,flood control evaluation should be conducted for construction projects within river management,and flood control evaluation reports should be prepared.Ensuring the safety of river flood discharge is an important foundation for bridge construction when building bridges on rivers.Therefore,flood control evaluation of cross river bridges is important.According to relevant laws,regulations,code standard and the requirements of the project planning approval documents,combined with the river evolution,existing water conservancy facilities and the implement arrangements of the water project,the technical route is reasonably determined.Based on the analysis and calculation of hydrology,banked-up water,erosion and deposition,river regime impact,a comprehensive evaluation is conducted on the flood control of the cross river bridge of Yongcheng National Highway 311 Yongcheng Reconstruction Project,and proposes the prevention and control measures for project impact.

crossing bridgeflood preventing evaluationhydrologybanked-up waterscour

蔡磊、许天一、蔡霞

展开 >

长江水利委员会长江下游水文水资源勘测局,江苏 南京 210011

珠江水利委员会珠江水利综合技术中心,广东 广州 510611

跨河桥梁 防洪评价 水文 壅水 冲刷

2024

海河水利
水利部海河水利委员会

海河水利

影响因子:0.21
ISSN:1004-7328
年,卷(期):2024.(2)
  • 5