Flood Control Countermeasures of Yongding River System in Tianjin
The current situation of flood control work in the Yongding River System in Tianjin is systematically sorted out.The problems existing in river embankment,flood storage and detention area,water engineering dispatching and flood control plan are pointed out.In view of the shortcomings of the current flood control system of the Yongding River System in Tianjin,practical and feasible countermeasures are proposed,including strengthening the construction of flood control projects,comprehensively promoting standardized management,strengthening the construction and management of flood storage and detention areas,finding out the basic data of the project,constructing a map of water project dispatching,improving the level of dispatching intelligence,and improving the plan and other measures.
embankment projectflood storage and detention areanon-structural measuresYongding River System