The construction method of buried stone concrete is employed in large volume concrete structures.By controlling the proportion of buried stones,the quantity of concrete utilized can be effectively decreased,the consumption of cement can be reduced,the hydration heat of dam concrete can be lowered,and the likelihood of temperature cracks in the dam can be mitigated,ultimately enhancing the quality of large volume concrete and reducing engineering investment.This article takes the application of buried stone concrete in Maxi Reservoir,Xiushan County,Chongqing as an example,and introduces the practical application of buried stone concrete from design scheme,construction technology requirements,temperature and quality control.It can provide a reference for similar projects.
buried stone concretegravity damconstruction technology requirementstemperature control requirements