The traditional method for evaluating the status of secondary equipment in ultra-high voltage power grids directly classifies the indicator system without establishing an evaluation indicator system for sec-ondary equipment,resulting in low evaluation efficiency of traditional methods.Propose a method for evaluat-ing the status of secondary equipment in ultra-high voltage power grids.Establish an evaluation index system for secondary equipment,list important evaluation indicators,and further classify the index system based on this.Train the sample set to achieve the evaluation of secondary equipment status in ultra-high voltage power grids.Design comparative experiments,and the experimental results show that this research method has higher evaluation efficiency.
关键词
超高压电网/二次设备/状态评估/评估方法
Key words
ultra-high voltage power grid/secondary equipment/status assessment/evaluation method