Analysis on Construction Technology of Shallow Buried Section at the Entrance of Shamaoshan Tunnel
Through a series of construction techniques such as advanced geological prediction for the shal-low buried section at the entrance of the Shamaoshan Tunnel,reinforcement technology for the shallow buried section,excavation technology for the shallow buried section,and monitoring measurement,the shallow buried section has been successfully passed.
Shamaoshan tunnelinlet shallow buried sectionconstruction techniqueexploration and analysis