大跨度连续框构桥下穿铁路既有线顶进施工技术

扫码查看
本文以香河路为例,探究了大跨度连续框构桥下穿铁路既有线顶进施工技术的应用.利用挖孔灌注桩对顶进工作坑进行支护,在此基础上开挖工作坑并通过预应力锚索施工提高了基坑稳定性,为框构桥施工创设有利条件.为节约工期,本工程中使用预制框构桥,经检查质量合格后使用液压系统进行顶进,顶进期间做好观测、控制偏差,顺利完成了框构桥顶进任务.
Jacking Construction Technology of Long Span Continuous Frame Bridge Under Railway Existing Line
Taking Xianghe Road as an example,this paper probes into the application of jacking con-struction technology of long-span continuous frame bridge under railway existing line.On the basis of the ex-cavation of the pit and the construction of prestressed anchor cable,the stability of the foundation pit is im-proved,which creates favorable conditions for the construction of framed bridge.In order to save the con-struction period,the prefabricated frame bridge is used in this project,and the hydraulic system is used to carry out the jacking after the quality is checked and qualified.During the jacking,the observation and devi-ation control are made,and the jacking task of the frame bridge is successfully completed.

long-span continuous frame bridgejacking constructionprestressed anchor cableline over-head

邹德建

展开 >

中铁二十二局集团第一工程有限公司,黑龙江哈尔滨

大跨度连续框构桥 顶进施工 预应力锚索 线路架空