This paper takes the actual project as the research object,deeply analyzes the influence of reservoir impoundment on the surrounding mines,and gives the corresponding control measures.In this paper,the geological conditions in the affected area are identified through engineering geological investigation,and the hazards in the affected area after reservoir impoundment are analyzed.The influence of reservoir im-poundment on mine water inrush in this project is clarified,and it is found that there are 23732 m2 of goaf in the three affected areas needed to be treated.The design parameters and design points of grouting sealing measures adopted in each place are described in detail.The research content of this paper can provide refer-ence for mine water inrush hazard control project.
关键词
水库蓄水、矿井突水隐患/突水隐患治理/注浆堵水/防水墙封堵
Key words
reservoir impoundment,mine water inrush hidden danger/water inrush risk management/grouting water plugging/waterproof wall sealing