装配式深基坑桩-梁-墙-锚杆预应力围护结构施工关键技术,整体遵循"分层开挖土方,分段吊装预制构件,桩-墙-锚杆复合结构设计,交叉预应力强化连接节点,'双排扁孔'T型钢板支撑条辅助吊装固定,'八字形'钢支撑横跨连接"为原则,技术方案经专家论证,可行有效,以供行业参考借鉴,校企联合,共同助推我国建筑产业现代化高质量发展.
Key Technology Research on Construction of Pile-Beam-Wall-Anchor Prestressed Enclosure Structure for Assembled Deep Foundation Pit
Assembled deep foundation pit pile-beam-wall-anchor pre-stressed enclosure structure construction key technology,the overall follow"layered excavation,segmental lifting prefabricated components,pile-wall-anchor composite structural design,cross pre-stressing to strengthen the connecting nodes,'double rows of flat holes'T-type steel plate support bar auxiliary lifting and fixing,'figure of eight'steel support span connection"as the principle of the technical program by the experts,feasible and effective for the industry to refer to reference,the school-enterprise alliance to jointly promote the high-quality development of China's modernization of the construction industry.

assembly construction technologyfoundation pit enclosurepile-beam-wall-anchor enclosure structurestructural designconstruction technology

朱苗苗、王宏俊、刘海峰

展开 >

江苏工程职业技术学院,江苏南通

南通市建设工程质量监督站,江苏南通

装配建造技术 基坑围护 桩-梁-墙-锚杆围护结构 结构设计 施工技术

南通市科技计划南通市科技计划南通市科技计划

MSZ2023171MSZ2023035JCZ2023032