Construction Technology of Automatic Traversing,Walking and Inserting for No.42 Turnout in Beijing-harbin Railway on Busy Trunk Line
In this paper,taking the newly-built Beijing-Tangshan Railway Jingtang-Jingha Link No.42 turnout as an example,there are not many mature cases and experiences for the existing line No.42 turnout.Because of the large volume,long length and difficult construction of No.42 turnout,there are strict requirements for personnel organization,construction sequence connection,construction safety and quality.Therefore,the analysis of the construction technology of No.42 turnout has provided a strong experience accumulation for the subsequent railway turnout.
No.42 turnoutbusiness line insertiontransverse slide rail