Installation Scheme and Debugging Analysis of Electromechanical Equipment in Expressway Tunnel
This paper probes into the key points of installation of cameras,jet fans and various kinds of cables in expressway tunnels,and expounds the specific methods of commissioning and debugging of tunnel electromechanical system,multi-system joint debugging and monitoring system debugging.The debugging results show that all kinds of mechanical and electrical equipment in the tunnel electromechanical system can be opened normally,the subsystems such as fire fighting and lighting can be jointly operated,and the driving picture in the tunnel can be presented in real time through widescreen displays,which realizes the visual management of the highway tunnel,and has positive help to improve the traffic efficiency of the highway tunnel and ensure the safe operation of vehicles.
expresswaymechanical and electrical equipmentjet fanelectromechanical linkage debugging