Research on Construction Technology of Dock Intersection Position Based on Steel Pipe Steel Sheet Pile Combination Connection
In order to improve the construction technology and quality control of the dock handover position,this article introduces the engineering overview,construction organization arrangement,rock socketed pile stabilization construction,anti leakage sand construction at the handover position,and displacement control of the front wall behind the backfill of the gravity type caisson dock with an L-shaped layout,based on the construction technology of the dock handover position based on the combination of steel pipe and steel sheet piles,An in-depth analysis was conducted on the key technical measures and application effects during the construction process.Its feasibility and reliability have been verified through practical applications.The research results indicate that this construction technology can significantly improve the stability and leak prevention performance of the dock junction position,effectively control the displacement of the front wall,and ensure the normal use and safety performance of the dock.